Manage Scheduled Load Jobs in CMC
View Scheduled Load Jobs
- Sign in to your Incorta tenant.
- Select Scheduler from the navigation bar.
- Navigate to any scheduled job for Dashboards, Schema Loads, or Data Alerts.
For scheduled load jobs that have been paused:
In the Next Run column for each job, the date shown will have a strikethrough. When you unpause the scheduled load job, the job will resume its original schedule.
For scheduled load jobs that have been enabled (unpaused):
In the Next Run column for each job the date shown should be displayed without a strikethrough.
Pause All Scheduled Load Jobs
- Log in to the CMC.
- Select Local from the CMC navigation bar.
- Select View.
- Select the Cluster Configurations tab then Default Tenant Configurations.
- Select Data Loading from the left panel.
- Toggle Pause Scheduled Jobs on to pause all scheduled schema loads, dashboards and data alerts.(Note: This option is disabled by default.) The switch will turn blue to indicate jobs have been paused.
- Select Save.
Pause Scheduled Load Jobs for Specific Tenant
- Select Clusters in the navigation bar.
- In the cluster list, select a cluster name.
- Select the Tenants tab.
- Select Configure for the given tenant.
- Select Data Loading in the left pane.
- Toggle Pause Scheduled Jobs on .
- Select Save.
Pause Scheduled Load Jobs during Tenant Import
- Select Clusters from the CMC navigation bar, then navigate to the Tenant tab.
- Select the + add button, then Import.
- Toggle Pause scheduled jobs on.
- Select Next then follow the prompts given by the Import Tenant wizard to complete the import process.
Re-enable Scheduled Load Jobs
From Cluster Configurations, navigate to Default Tenant Configurations then choose Data Loading.
- Toggle Pause scheduled jobs off to re-enable scheduled jobs that had been previously paused.
- Select Save.